Skip to content

Running the company

Quality inspections

← All documentation · Running the company

Web app5 min readUpdated

Inspections are scored walkthroughs of one building on one day: each line carries an area, what was checked, a 1–5 rating, a comment and a photo. A walkthrough can start from a list of checks (the building’s own cleaning checklist, a checklist template or the standard walkthrough, which an owner can replace with the company’s own) or start blank. Completing an inspection snapshots its score as a percentage and freezes the lines; areas that could not be accessed are excluded rather than scored zero. Bad lines become corrective actions with an owner and a due date, and an inspection you choose to share appears on the client’s portal beside their invoices.

Replace the built-in standard walkthrough with your company’s own list of checks, and reset it when you like.

All videos →

Commercial contracts are rarely lost over one bad night. They are lost over drift: a facilities manager who has been mildly unhappy for four months, has mentioned it twice, and renews with somebody else without ever having a row about it.

The defense is documentation. A supervisor walks the building on a schedule, scores each area, photographs what is wrong, and the client sees the same scorecard you do.

Scheduling a walkthrough

Work → Inspections → Schedule a walkthrough. Pick the client and the building, the date, and, if you already know, the person walking it.

Then choose What to check. This is the list the walkthrough is scored against, and keeping it the same from one walkthrough to the next is what makes two scores of one building comparable.

Choice What it lists
This building's cleaning checklist The tasks on the building's digital checklist, grouped by area: the work your crew is paid to do there. Chosen for you when the building has one. Starter and above.
Checklist template Any template from your checklist library. Starter and above.
Standard walkthrough Your company's own standard walkthrough, once an owner has saved one (see below). Until then, the built-in list: 25 checks across six areas of a typical commercial building: entrance and lobby, restrooms, break room, offices, hallways and stairs, and the building as a whole. Each is worded as the result you look for, such as "Floors mopped, no odor". Chosen for you when the building has no checklist.
Start blank No lines. You add them on the walk.

Open See all … checks to read the list before you schedule. The lines arrive unscored, and the inspection stays Scheduled until somebody scores one. You can still add, rename or remove lines on the walk.

Already have an empty walkthrough? Open it, choose a list under Nothing scored yet, press Use this list, then Save lines.

Your company's standard walkthrough

An owner can replace the built-in list with the company's own. On Work → Inspections, select Edit standard walkthrough. Each line has an Area and What to check. Change a line, remove one with Remove or add one with Add a check, then select Save. The editor is locked while it saves.

From then on, Standard walkthrough offers your list for every new walkthrough of a building without its own checklist, on every plan. Walkthroughs already scheduled keep the list they were made with.

Reset to built-in list asks first, then deletes your version, and new walkthroughs start from the built-in list again.

If your company's standard walkthrough cannot be loaded, Standard walkthrough is not offered, so a walkthrough is never scored against the built-in list by mistake. Select Try again.

Scoring it

Each line has four parts:

Part What it is
Area Where you are: "Third floor", "Loading dock", "Main restrooms"
Checked What you looked at: "Restrooms", "Carpet edges", "Glass"
Rating 1–5, the scale every janitorial inspection form already uses
Photo Optional, and the single most useful thing on the line

Areas are free text rather than a list of the rooms on the quote. An inspection walks the building as it is today, and you should not be blocked from scoring a corridor nobody put on the spec.

Take the photo. Six months from now, in a conversation about whether the third floor has "always been like that", the photograph is the entire argument. Nothing else in this feature is worth as much.

An area you could not get into is not a zero

Leave the rating blank. A locked server room, a floor being refitted, a wing the client had closed: none of those are bad cleaning, and scoring them zero would punish you for somebody else's door and teach your supervisors to invent a number rather than leave it blank.

Unscored lines stay on the inspection as evidence that access was refused, and leave the score entirely.

The score

Completing the inspection works out the score as a percentage of what was achievable: the total awarded, over five times the number of lines you actually scored. An inspection of eleven areas and one of forty are therefore comparable, and the number your client sees is one they recognize.

Three things happen at completion, and they are deliberate:

  • The score is computed from the lines, never typed.
  • The score is snapshotted. It does not move afterwards.
  • The scored lines freeze. A scorecard that no longer follows from its own evidence is worse than a low one.

Notes and sharing stay editable, because that is how a completed inspection gets published, and neither changes the score.

If nothing could be scored, the inspection reports no score rather than 0%. Zero would read as the worst clean on record.

Corrective actions

A bad line is only half the job. We scored it a 2 and did nothing is the pattern clients actually leave over.

Raise a corrective action against the line: what needs doing, who is doing it, and by when. Actions live past the inspection that raised them (Inspections → Still outstanding is every outstanding one across every building, oldest due date first) and closing one asks for a note about what was actually done.

Two people closing the same action from two phones cannot overwrite each other: the second is told it has already been resolved.

Showing the client

An inspection is an internal management document until you say otherwise. Switch Share with client on, and it appears on that customer's portal as a percentage, a date and whatever you wrote in the client-facing note. The line-by-line detail stays with you.

Sharing needs customer permissions, where scoring only needs schedule ones. A supervisor scores a building; whether the facilities manager gets to read that scorecard is the office's call.

Access and platform

Use the web app, including a phone browser, for inspections and corrective actions. The app has no inspection screens. Scoring needs scheduling permission; sharing with a client needs customer write permission; only an owner can edit the standard walkthrough. Crew members cannot open this management area. A visit checklist or photo in the app is not an inspection scorecard.

While offline, the web editor can keep a draft of inspection lines, ratings and notes. Reconnect to upload photos, complete the inspection or share it. Review a newer server version before replacing it with an older draft.

Watch the walkthrough